Renovation project checklist
Everything here happens before the first tool comes out of a van. Skipping it to start sooner is the most common way a renovation runs over budget.
25 items
Makes your own editable copy. No account needed.
The items
- Scope written down before a single quote is asked forA trade quoting against a vague brief will quote against their own assumptions, not yours.
- At least three quotes compared like for like
- Same specification given to each trade
- Payment schedule and deposit asked for
- Public liability insurance checked
- Planning permission or building regulations checkedCheck the current rules for your specific project rather than assume it's exempt.
- Party wall agreement sorted with neighbours if it appliesThis carries a legal notice period, so start it earlier than feels necessary.
- Budget set with a contingency of at least ten per centSomething is almost always found once a wall is opened up.
- Contract or written agreement signed before work starts
- Start and finish dates
- Payment stages tied to completed work, not the calendar
- What happens if either side wants to end it
- Utilities isolated or protected where the work will happen
- Rooms not being worked on sealed off from dust
- Access agreed
- Parking for skips and vans
- Who holds a key while work is underway
- Working hours agreed with neighbours
- Materials ordered with a lead time checkedTiles and specific fittings can take weeks — order before the trade needs them, not when they ask.
- Skip or waste removal booked
- Insurance checked for cover during building workSome standard home policies exclude damage during major renovation — check before, not after.
- Photographs taken before work startsFor the inevitable dispute about what was already damaged.
- Daily point of contact agreed with the lead trade
- Snagging list started from day oneA small issue noted immediately is a fraction of the argument it becomes once everyone's moved on.
- Final payment held back until snagging is finishedTake advice on retention if the contract doesn't already cover it.
Makes your own editable copy. No account needed.
Questions people ask
- How much contingency should I budget for a renovation?
- At least ten per cent on top of the quoted price. Something is nearly always found once a wall or a floor is actually opened up.
- Do I need planning permission for a renovation?
- It depends on the project and where you live — check the current rules rather than assume it counts as permitted development.
- What if the trade wants full payment before starting?
- Be cautious. Tie payments to stages of completed work instead, and take advice before agreeing to pay everything up front.