monpetitlistou
All templates

Tiling a bathroom checklist

Tiling looks like the skilled part; waterproofing underneath it is what actually decides whether the job lasts. Get the surface right before a single tile goes on.

19 items

Makes your own editable copy. No account needed.

The items

  1. Surface checked and made flatTiling follows the wall underneath — hollows and bumps telegraph straight through the finished tiles.
  2. Waterproofing membrane or tanking kitAnywhere water runs directly onto the wall — inside a shower, around a bath — needs this before a single tile goes on.
  3. Primer, if the surface needs it
  4. Tile adhesive×2Buy slightly more than the calculator suggests — running out mid-wall means waiting for the same batch number.
  5. Notched trowel, sized to the tile
  6. Tile spacers×20Consistent gaps matter more for how finished the job looks than almost anything else.
  7. Tile cutter or a wet saw, hired for the dayWorth hiring rather than buying — a good cutter is expensive and used once a year at most.
  8. Spirit level, and a laser level for a large area
  9. Layout planned and dry-laid first
  10. Start point chosen so cut tiles land in the least visible spot
  11. Whole tiles centred on the most visible wall, not the corner
  12. TilesOrder a few extra for breakages and future repairs — dye lots change, and a replacement tile in five years may not match.
  13. Grout, colour matched to the tile
  14. Grout float and a sponge
  15. Sealant for the corners and where tile meets bath or floorGrout cracks in a moving joint; sealant flexes with it. Using grout there is why the corner goes mouldy first.
  16. Adhesive left to cure fully before groutingUsually 24 hours, checked against the tin rather than guessed.
  17. Extractor fan checked or fittedA bathroom that can't clear steam undoes the waterproofing before it's finished setting.
  18. Silicone or grout sealer kept for maintenance later
  19. Tiles left to settle a few days before the shower gets full use

Makes your own editable copy. No account needed.

Questions people ask

Do I need to waterproof (tank) the wall before tiling?
Yes, anywhere water runs directly onto it — inside a shower and around a bath. Tiling straight onto plasterboard there is why bathrooms rot from the inside years later.
How long should grout and adhesive be left before use?
Follow the tin, usually around 24 hours for adhesive before grouting, and several days before the shower gets full use — rushing this is a common cause of tiles coming loose.
What's the biggest mistake first-timers make?
Not planning the layout before starting. A tile row that ends in a sliver at the door was decided the moment the first tile went on in the wrong spot.